Language Selection

Get healthy now with MedBeds!
Click here to book your session

Protect your whole family with Orgo-Life® Quantum MedBed Energy Technology® devices.

Advertising by Adpathway

         

 Advertising by Adpathway

Mozambique’s ENH Joins Coral Norte Drilling

4 hours ago 4

PROTECT YOURSELF with Orgo-Life® QUANTUM TECHNOLOGY

Orgo-Life the new way to the future

  Advertising by Adpathway

National Heroes Square in Pemba, Cabo Delgado Province, Mozambique, with a painted provincial sign and a woman carrying a basketFile photo. National Heroes Square in Pemba, capital of Cabo Delgado Province, Mozambique, 2020. Photo: VOA, public domain, Wikimedia Commons.

MOZAMBIQUE · LNG

Key Facts

  • What Eni says ENH-Saipem Drilling Company will drill and complete the wells for the Coral Norte floating gas plant.
  • When Announced Monday 2 November 2026; the campaign should take about 10 months.
  • Where Area 4 of the Rovuma Basin, offshore Cabo Delgado Province, northern Mozambique.
  • Output With Coral Sul, Coral Norte should lift Mozambique’s LNG output to 7 million tonnes a year.
  • Cost and start-up About US$7.2 billion, with gas production expected in 2028.

Coral Norte drilling in Mozambique now has a state-owned partner on the rig: ENH, the national oil and gas company. Eni, the Italian energy group leading the project, announced the campaign on Monday 2 November 2026, with ENH joining through a venture with Saipem.

Free daily brief — no card needed

Get every Africa story in one morning email

We build you a personalized brief around the topics you follow — free for 7 days. Love it? Your first month after that is US$1.

Yes, email me my free daily brief — I can unsubscribe any time.

The wells will feed a floating plant that turns gas into liquefied natural gas (LNG), gas chilled into a liquid for ships. For US readers, it adds supply that American exporters compete against in Europe and Asia from 2028.

What Eni Announced on 2 November

Eni said on Monday 2 November 2026 that the Coral Norte drilling campaign is beginning, in a statement dated Maputo, Sunday 1 November. The wells will supply a floating plant moored offshore.

The work is done by ENH-Saipem Drilling Company, a joint venture of ENH and Saipem, an Italian offshore contractor. It uses the drillship Saipem 12000, a vessel built for deep-water drilling.

Eni calls the joint venture a landmark for local content, meaning more work for Mozambican staff and firms. It says this is the first time a company with Mozambican participation takes a direct operational role in offshore drilling.

The liquefied natural gas carrier Gulf Energy at anchor beside a rocky shoreFile photo. The LNG carrier Gulf Energy at anchor, shown to illustrate the liquefied gas trade; taken in Norway. Photo: Gordon Leggett, CC BY-SA 4.0, Wikimedia Commons.

Follow this story

Get an email when there’s news on Mozambique

Free. One email a day at most, and only when there is news. This also signs you up to our weekday newsletter, Africa Intelligence. Nothing arrives until you click the confirmation link, and you can stop either with one click. Privacy policy.

In Plain English, Who Is Who

ENH, short for Empresa Nacional de Hidrocarbonetos, is Mozambique’s state oil and gas company. It is already one of Eni’s partners in Area 4, the offshore gas block where Coral Norte sits.

Eni leads the project. Its statement names CNPC, a Chinese state oil group, KOGAS, South Korea’s gas company, and XRG, an Abu Dhabi energy investor, as partners.

Saipem is an Italian offshore engineering and drilling contractor that shares the drilling company with ENH. INP, the Instituto Nacional de Petróleo, is Mozambique’s state regulator for oil and gas.

How Big Is Coral Norte

Coral Norte is a floating LNG plant, known as an FLNG, that will sit above the northern part of the Coral gas field. INP says it is designed for 3.55 million tonnes of LNG a year from six underwater wells.

INP puts the investment at about US$7.2 billion and expects roughly US$23 billion in revenue over the project’s life. It says the plant will be anchored about 10 kilometres from Coral Sul and more than 50 kilometres off the coast of Palma district.

Mozambique’s Council of Ministers, the cabinet, approved the development plan in April 2025, and the partners took their final investment decision in October 2025. Eni says the first plant, Coral Sul, has already delivered more than 175 LNG cargoes.

What It Means for You

Mozambique’s LNG competes with US cargoes for buyers in Europe and Asia, so a second plant adds supply that American exporters will face from 2028. No direct effect on US gas prices is expected before then.

Nearby projects include TotalEnergies’ restart of its Area 1 project and ExxonMobil’s contracts for Rovuma LNG, a separate project in the same area. A drilling start on schedule is one more sign that the northern gas coast is moving from planning to building.

What Is Not Known

Eni’s statement gives no count of wells for this campaign and no contract value. The six-well and 3.55 million tonne figures come from INP’s January 2026 description of the design.

ENH’s share of the drilling joint venture has not been disclosed. The 2028 start-up also depends on the floating plant itself, whose hull was launched in January 2026 at a shipyard in South Korea.

More: Africa news in English, every day from The Rio Times.

Frequently Asked Questions

What is ENH?

ENH is Mozambique’s state-owned national hydrocarbons company. It is a partner in Area 4 and shares the drilling company working on Coral Norte with Saipem.

When will Coral Norte produce gas?

Eni expects production to start in 2028. The drilling and completion campaign is expected to take about 10 months.

How much LNG will Coral Norte make?

INP says the plant is designed for 3.55 million tonnes a year. With Coral Sul, Eni says Mozambique’s LNG output would reach 7 million tonnes a year.

Does this change US gas prices?

No direct effect is expected before 2028, when Coral Norte is due to start. After that it adds LNG supply that competes with US cargoes for buyers.

Sources: Eni, press release on the start of the Coral North FLNG drilling campaign, 2 November 2026; INP (Instituto Nacional de Petróleo), Coral Norte FLNG hull launch, 16 January 2026.

This article was produced by The Rio Times’ automated newsroom system. How we use AI · Report an error · Editorial responsibility: Matthias Camenzind, Editor-in-Chief

Read Entire Article

         

        

Start the new Vibrations with a Medbed Franchise today!  

Protect your whole family with Quantum Orgo-Life® devices

  Advertising by Adpathway