Hudbay Delivers Strong Second Quarter 2026 Results and Improves Cash Cost Guidance

1 month ago 20

PROTECT YOURSELF with Orgo-Life® QUANTUM TECHNOLOGY

Orgo-Life the new way to the future

  Advertising by Adpathway

Article content

Despite the operating constraints on the primary SAG, the mill processed 3.6 million tonnes of ore during the second quarter of 2026, an increase of 17% compared to the first quarter of 2026, benefitting from improved operating parameters from the second SAG mill and the temporary conveyor system trial in place to divert crushed pebbles from the primary SAG to the second SAG. Based on the successful trial, a more permanent system is being constructed and is scheduled to be commissioned by the fourth quarter.

Article content

Milled copper grades during the second quarter of 2026 were higher compared to the first quarter of 2026, driven by a greater proportion of ore feed mined from a higher-grade phase in the second quarter of 2026. Copper and gold recoveries during the quarter declined to 77% and 63%, respectively. This decline resulted from the ramp-up of mill throughput during the second quarter which revealed a grinding constraint in the ball mills, resulting in increased grind size and lower overall recoveries compared to the first quarter of 2026. Several grinding initiatives are underway, alongside flotation advanced process controls to improve recoveries.

Article content

Article content

Combined mine, mill and G&A unit operating costs in the second quarter of 2026 were C$25.52 per tonne milled, a marginal increase compared to the first quarter of 2026, primarily driven by higher mining and G&A costs, partially offset by lower milling costs and higher milled throughput.

Article content

Cash costi and sustaining cash costi, net of by-product credits, were $3.22 and $6.23, respectively, per pound of copper in the second quarter of 2026. Cash costi was higher than in the first quarter of 2026 primarily as a result of higher mining costs, less deferred stripping and lower by-product credits, partially offset by higher copper production. The increase in mill availability in the second quarter of 2026 allowed for higher mill throughput and enhanced operational efficiencies. Although second quarter cash cost was above the 2026 guidance range due to external cost pressures, Hudbay expects to achieve the full year 2026 cash cost guidance range in British Columbia.

Article content

Key Leadership Appointments

Article content

Hudbay is pleased to announce senior management team appointments as the Company positions itself for the next phase of transformational growth. Eugene Lei has been appointed President and Chief Financial Officer, with Peter Kukielski continuing as Chief Executive Officer. Robert Carter has been appointed Chief Operating Officer, transitioning from Andre Lauzon who will retire at the end of September.

Article content

Mr. Lei has been Chief Financial Officer since 2022 and has been responsible for providing strategic financial and capital markets leadership at Hudbay. He has been instrumental in the Company’s significant transformation, and under his leadership, Hudbay successfully executed the strategic plan to unlock Copper World, which included achieving stated balance sheet targets ahead of schedule and prudently allocating capital to maximize shareholder value. He currently serves as the Chair of the Copper World Joint Venture board. Mr. Lei joined Hudbay in 2012 and progressed through several senior management roles with increasing executive responsibilities. He has over 25 years of global mining finance, investment banking and corporate development experience. Prior to joining Hudbay, Mr. Lei was Managing Director, Mining at Macquarie Capital Markets, working as an advisor on transformative mining mergers and acquisitions and leading equity capital markets offerings. He holds a Bachelor of Commerce (Honours) degree from Queen’s University. In 2025, Mr. Lei was the recipient of the Globe and Mail’s Report on Business 2025 Canada’s Best Executive Award in the Finance category. In 2015, Mr. Lei received the Canadian Institute of Mining, Metallurgy and Petroleum’s CIM-Bedford Canadian Young (under 40) Mining Leaders Award.

Article content

Mr. Carter was appointed Senior Vice President, Canada in June 2025, and as leader of the Canadian operations, he has been responsible for the strategic oversight of Hudbay’s business activities in Manitoba and British Columbia. His leadership in Manitoba revitalized the operations into a sustainable cash flow contributor and he has strategically positioned the British Columbia operations for long-term success. Mr. Carter’s extensive experience with a deep focus on safety and continuous improvement has been invaluable at the operations and is seen through consistent operational execution. Previously, he held the role of Vice President, Manitoba Business Unit since April 2022 and prior to that was the General Manager of the Company’s Manitoba mines since 2018. He has held various other positions at Hudbay, including Manager of the Lalor Mine in Manitoba and Director of Business Development and Technical Services in Hudbay’s corporate group. He has nearly 30 years of mining industry experience in technical, operational and senior leadership roles, with the majority of those years at Hudbay. Mr. Carter holds a Bachelor of Science, Geological Engineering from the University of Manitoba and is a Professional Engineer registered with Professional Engineers Ontario and Engineers Geoscientists of Manitoba.

Article content

The Company is grateful for Mr. Lauzon’s significant contributions since joining Hudbay in 2016. Mr. Lauzon was the architect of the Copper World project, and his valued expertise as Chief Operating Officer has positioned the Company’s operating and growth platform for long-term success. Mr. Lauzon has worked closely with Mr. Lei over the past several years on operational finance and growth, focusing the business on delivering strong free cash flow. He has also worked closely with Mr. Carter in optimizing the Company’s Canadian operations and de-risking many growth projects across the business, and Mr. Carter’s appointment ensures a seamless transition in accordance with Hudbay’s succession planning. In his retirement, Mr. Lauzon will also provide on-going consulting and advisory services to Hudbay.

Article content

Hudbay has appointed Sebastien Fortin as Vice President and Head of the British Columbia Business Unit (“BCBU”). Mr. Fortin has been serving as Acting Head of the BCBU since October 2025 after first joining Copper Mountain as General Manager of Operations in 2024. Under his leadership, the operations have achieved many productivity and safety objectives, and he continues to drive significant improvements across the business to position Copper Mountain for long-term success. Mr. Fortin is a Professional Mining Engineer and he previously worked at Teck Resources for 16 years in several senior technical roles before joining Hudbay. He holds a bachelor’s degree in Geological Engineering and a master’s degree in Mining Engineering, both from Laval University, and is a graduate of the MBA Program at Simon Fraser University.

Article content

Hudbay also announced that Warren Flannery is taking on an expanded role as Vice President and Head of the Arizona Business Unit, and he will continue to support Javier Del Rio, Senior Vice President and Head of Hudbay USA. Under this enhanced role, Mr. Flannery is responsible for leading the business development and operational readiness of Copper World and the advancement of the Cactus project through feasibility studies and key de-risking initiatives. He previously held the role of Vice President of Copper World since August 2024 and he first joined Hudbay in 2023 as Vice President, Business Planning and Reclamation. Mr. Flannery is an experienced mining professional with over 30 years of extensive experience in mine operations, planning and project development at global companies. Prior to joining Hudbay, Mr. Flannery was the head of the mining technical group at CIBC’s global mining corporate and investment banking arm for ten years. He is a Professional Engineer and holds a master’s degree in Mineral Economics from the Colorado School of Mines and a bachelor’s degree in Mining Engineering from Queen’s University.

Article content

Continued Free Cash Flow Generation Driven by Strong Operating Margins; External Cost Pressures Insulated by Diversified Copper and Gold Exposure

Article content

Hudbay’s unique copper and gold diversification across its operations provides exposure to strong commodity prices, which together with a focus on cost control across the business, continues to realize strong margins and generate attractive free cash flow. While the majority of Hudbay’s revenue continues to be derived from copper production, revenue from gold production represents a meaningful portion of total revenues, with gold accounting for 38% of total revenue in the second quarter of 2026.

Article content

Hudbay’s cost control efforts are focused on navigating external cost pressures, such as higher fuel and consumable costs. The Company continues to manage costs and deliver strong margins through initiatives to further improve throughput and enhance operating efficiencies. Despite such external cost pressures in the second quarter, Hudbay achieved consolidated cash costi of negative $0.40 per pound of copper and generated operating cash flow of over $200 million and free cash flow of over $100 million, similar to the first quarter of 2026. Hudbay continues to benefit from its diversified platform with significant by-product credits from gold production.

Article content

The Company had $890.9 million in cash and cash equivalents and net debti of negative $80.5 million at the end of the second quarter of 2026. Hudbay’s strong cash position and continued prudent balance sheet management position the Company well to advance its generational growth investments across the portfolio and allocate capital to the highest risk-adjusted return opportunities to deliver significant value for stakeholders.

Article content

Copper World DFS Progressing Well and Project Sanctioning on Track for Late 2026

Article content

In January 2026, Hudbay announced the closing of the joint venture transaction with Mitsubishi, securing a premier, long-term strategic partner for the development of Copper World. The $420 million of initial proceeds received at closing from Mitsubishi will be used to directly fund the remaining DFS costs and pre-sanctioning costs in addition to the initial project development costs for Copper World. Mitsubishi will contribute an additional $180 million within 18 months of closing to complete its 30% minority investment and will also fund its pro-rata 30% share of future equity capital contributions.

Article content

Feasibility activities for the Copper World DFS are progressing well, with 95% of the engineering work completed, and a sanctioning decision remains on track for later in 2026. The DFS is expected to reflect higher capital expenditures as compared to the 2023 pre-feasibility study primarily due to typical cost inflation along with new capital related to project scope changes that would allow for future mill expansion optionality, while continuing to generate robust economics.

Article content

On June 24, 2026, Copper World LLC received proceeds of an offering of $52.0 million aggregate principal amount of solid waste disposal revenue bonds due July 2, 2036 (the “Municipal Bonds”). The Municipal Bonds were issued by the Arizona Industrial Development Authority at par and carry a fixed interest rate of 4.5% per annum, with interest payable by Copper World LLC semi-annually. The Municipal Bond proceeds may be used for certain eligible costs associated with the development of the Copper World project and are treated as restricted cash on Hudbay’s balance sheet.

Article content

Completion of the Arizona Sonoran Acquisition to Create the Third Largest Copper District in North America

Article content

On June 24, 2026, Hudbay successfully completed its previously announced acquisition of Arizona Sonoran (“ASCU”), pursuant to which Hudbay acquired all of the issued and outstanding common shares of ASCU not already owned by Hudbay (the “ASCU Transaction”).

Article content

As a result of the completion of the ASCU Transaction, Arizona Sonoran became a wholly-owned subsidiary of Hudbay and Hudbay acquired 100% ownership of Arizona Sonoran’s Cactus project. In aggregate, Hudbay issued 46,794,082 Hudbay common shares under the ASCU Transaction to former Arizona Sonoran shareholders as consideration for their shares. Following the closing of the ASCU Transaction, the Arizona Sonoran shares were de-listed from the Toronto Stock Exchange (“TSX”) and Arizona Sonoran ceased to be a reporting issuer pursuant to applicable Canadian securities laws.

Article content

The ASCU Transaction brings together two highly complementary copper growth assets in Arizona and strengthens Hudbay’s position as a premier Americas-focused copper company with a pipeline of long-life, low-cost assets located in tier-one jurisdictions. The ASCU Transaction is expected to enhance Hudbay’s long-term copper production profile, expand its U.S. growth pipeline, and generate significant operational efficiencies and regional synergies with Hudbay’s staged development of Copper World and Cactus.

Article content

Hudbay expects to spend approximately $30 million at Cactus in the second half of 2026 to advance an updated pre-feasibility study (“PFS”), perform site de-risking activities, conduct exploration activities and for other ongoing site costs. The updated Cactus PFS is expected to be completed in the second half of 2027.

Article content

New Ingerbelle Expansion Project Underway to Enhance Copper and Gold Production Profile at Copper Mountain

Article content

In June 2026, Hudbay celebrated the official groundbreaking of the New Ingerbelle expansion project at Copper Mountain, marking a significant milestone for the operation and its long-term future in British Columbia. The event was attended by Hudbay’s executive team, employees, B.C.’s Minister of Mining and Critical Minerals, the B.C. Mining Association, the Chief of the Upper Similkameen Indian Band, regional representatives, and leaders from the local community. The event was also recognized by Canada’s Minister of Energy and Natural Resources.

Article content

New Ingerbelle enhances the copper and gold production profile and secures a longer mine life at Copper Mountain. Based on current mineral reserves, New Ingerbelle is projected to produce approximately 750,000 tonnes of copper, 900,000 ounces of gold and 5.5 million ounces of silver over the life of mine. Designed to access higher-grade mineralization, the expansion also features a stripping ratio approximately three times lower than current mining areas.

Article content

The groundbreaking comes shortly after the Government of British Columbia added New Ingerbelle to its list of priority resource projects, recognizing initiatives that support economic growth, responsible resource development and long-term value creation across the province. The New Ingerbelle expansion received key mining permits on February 19, 2026 from the British Columbia Major Mines Office (“MMO”) following a robust review and consultation process. Throughout the permitting process, Hudbay proactively engaged with the MMO, local communities, the Upper Similkameen Indian Band (“USIB”) and the Lower Similkameen Indian Band (“LSIB”) to ensure transparency and collaborative oversight and to seek consensus, although as previously disclosed, the LSIB subsequently submitted an application for judicial review of the regulatory decision to grant the New Ingerbelle permit amendment.

Article content

With key permits in place, Hudbay is advancing important infrastructure required for the expansion, including an access road, a bridge across the Similkameen river and an east haul road connecting New Ingerbelle to existing operations. Growth capital expenditures in British Columbia in 2026 are expected to increase by approximately $30 million to $115 million related to additional costs associated with infrastructure development at New Ingerbelle. Hudbay expects similar levels of growth capital investments in British Columbia in 2027 related to the continued infrastructure development at New Ingerbelle, which is expected to achieve first production in late 2028. The Company has also initiated a targeted drilling program at New Ingerbelle, focusing on upgrading existing inferred resources to reserves to further optimize and extend the mine life at Copper Mountain.

Article content

Peru Regulatory Approval Received to Further Increase Mill Throughput at Constancia

Article content

Hudbay received approval from the National Environmental Certification Service for Sustainable Investments in Peru to amend its environmental permit and further increase annual mill processing capacity at Constancia. The approval was received in late June and represented the fifth environmental permit amendment at Constancia. The amended permit increases the processing capacity of the Constancia mill to 34 million tonnes of ore per annum from the previously permitted 31 million tonnes. In March 2026, Hudbay received permit approval to increase mill throughput capacity to 31 million tonnes from 29.9 million tonnes per annum.

Article content

As part of the Company’s continuous improvement efforts, the updated permit enables additional capacity to further optimize Constancia’s operations and deliver strong copper production. Hudbay’s efforts to increase mill throughput align with the Peru Ministry of Energy and Mines’ regulatory framework, which permits operational flexibility to operate up to 10% above nominal daily capacity. Hudbay achieved total ore processed of 30.3 million tonnes and 31.9 million tonnes in 2025 and 2024, respectively. With this permit amendment, Hudbay is aligning its operational capacity to support the new level of 34 million tonnes per annum, while maintaining the standard operational flexibility to handle daily increases of up to 10% above permitted levels.

Article content

Large Exploration Drill Program Continues in Snow Lake

Article content

Hudbay continues to execute the largest exploration program in Snow Lake in the Company’s history through extensive geophysical surveying and drilling campaigns as part of Hudbay’s multi-pronged exploration strategy:

Article content

  • Near-mine Exploration at Lalor and 1901 to Further Increase Near-term Production and Extend Mine Life – Near-mine exploration at the Lalor mine and the adjacent 1901 deposit continued to support near-term production growth and mine life extension. The exploration program will continue during the remainder of 2026 to potentially increase mineral reserves and resources and enable additional resource conversion. At the 1901 deposit, activities are focused on exploration and definition drilling, orebody access and establishing the critical infrastructure required to support full production beginning in late 2027. Exploration activities at 1901 will include step-out drilling to potentially extend the orebody, as well as infill drilling aimed at converting inferred mineral resources within the gold lenses to mineral reserves.
  • Evaluating Significant Gold Production Potential from Past-Producing New Britannia mine – Acquired through the New Britannia mill acquisition in 2015, the past-producing New Britannia mine provides potential for significant incremental gold production in Snow Lake. The Company is developing an exploration plan to test down plunge extensions and underexplored areas between known deposits at the mine. Hudbay plans to conduct infill and expansion drilling at the 3 Zone, a satellite deposit to New Britannia, with three drills scheduled for later in 2026.
  • Testing Regional Satellite Deposits to Utilize Available Processing Capacity and Increase Production – Hudbay’s extensive regional land package includes an attractive portfolio of deposits in Snow Lake within trucking distance of the Snow Lake processing infrastructure, including the Talbot, Rail, Pen II, Watts and WIM deposits. With available mill processing capacity at the Stall mill, the Company continues to progress exploration work across the region to define satellite deposits to potentially increase production and extend the life of the Snow Lake operations beyond 2041. During the second quarter of 2026, the infill drilling program at Talbot was completed as well as the geotechnical drilling required for PFS activities. The Company is also testing additional targets to expand the footprint of the deposit at depth. Hudbay intends to update Rockcliff’s prior mineral resource estimate for Talbot using Hudbay’s standard methods.
  • Exploring Large Land Package for New Anchor Deposit to Significantly Extend Mine Life – A majority of the land claims acquired as part of the Rockcliff acquisition in 2023 have been untested by modern deep geophysics, which was the discovery method for the Lalor deposit. The large geophysics program underway consisting of surface electromagnetic surveys using cutting edge techniques that enable the team to detect targets at depths of almost 1,000 metres below surface. The planned 2026 geophysics program includes 600 kilometres of ground electromagnetic surveys and an extensive airborne geophysics survey.

Article content


Mason Project Commences Pre-feasibility Study Activities

Article content

The Mason project is a 100% owned greenfield copper deposit located in the historic Yerington District of Nevada and is one of the largest undeveloped copper porphyry deposits in North America. Hudbay views the Mason project as a long-term future development asset as part of the Company’s pipeline of high-quality copper growth opportunities.

Article content

Hudbay completed a preliminary economic assessment on Mason in 2021 which contemplated a 27-year mine life with average annual copper production of approximately 140,000 tonnes over the first ten years of full production. The Company recently initiated PFS activities at Mason and expects to spend approximately $20 million in evaluation expenses at Mason for the remainder of 2026. The Mason PFS is expected to be completed in the second half of 2027.

Article content

Dividend Declared

Article content

A quarterly dividend of C$0.01 per share was declared on July 28, 2026. The dividend will be paid out on September 8, 2026 to shareholders of record as of close of business on September 25, 2026.

Article content

Website Links

Article content

Article content

Management’s Discussion and Analysis:
https://www.hudbayminerals.com/MDA726

Article content

Article content

Conference Call and Webcast

Article content

Date:Wednesday, July 29, 2026
Time:11:00 a.m. ET
Webcast:www.hudbay.com
Dial in:647-846-8185 or 1-833-752-3516

Article content

Article content

Qualified Person and NI 43-101

Article content

The technical and scientific information in this news release related to all of Hudbay’s material mineral projects other than the Copper Mountain mine has been approved by Olivier Tavchandjian, P. Geo., Senior Vice President, Exploration and Technical Services. The technical and scientific information in this news release related to the Copper Mountain mine has been approved by Marc-Andre Brulotte, P. Geo., Executive Director, Global Mineral Resource Evaluation. Messrs. Tavchandjian and Brulotte are qualified persons pursuant to NI 43‑101.

Article content

For a description of the key assumptions, parameters and methods used to estimate mineral reserves and resources at Hudbay’s material mineral properties, as well as data verification procedures and a general discussion of the extent to which the estimates of scientific and technical information may be affected by any known environmental, permitting, legal title, taxation, sociopolitical, marketing or other relevant factors, please see the technical reports for the Company’s material properties are available on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov.

Article content

Non-GAAP Financial Performance Measures

Article content

Adjusted net earnings (loss) attributable to owners, adjusted net earnings (loss) per share attributable to owners, adjusted EBITDA, net debt, net debt to adjusted EBITDA, free cash flow, cash cost, sustaining and all-in sustaining cash cost per pound of copper produced, cash cost and sustaining cash cost per ounce of gold produced, combined unit cost and ratios based on these measures are non-GAAP performance measures. These measures do not have a meaning prescribed by IFRS and are therefore unlikely to be comparable to similar measures presented by other issuers. These measures should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS and are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently.

Article content

Management believes adjusted net earnings (loss) attributable to owners and adjusted net earnings (loss) per share attributable to owners provides an alternate measure of the Company’s performance for the current period and gives insight into its expected performance in future periods. These measures are used internally by the Company to evaluate the performance of its underlying operations and to assist with its planning and forecasting of future operating results. As such, the Company believes these measures are useful to investors in assessing the Company’s underlying performance. Hudbay provides adjusted EBITDA to help users analyze the Company’s results and to provide additional information about its ongoing cash generating potential in order to assess its capacity to service and repay debt, carry out investments and cover working capital needs. Net debt is shown because it is a performance measure used by the Company to assess its financial position. Net debt to adjusted EBITDA is shown because it is a performance measure used by the Company to assess its financial leverage and debt capacity. Free cash flow is shown as it provides investors and management additional information in assessing the Company’s ability to generate cash flow from current operations after investing in capital to sustain the operations. Cash cost, sustaining and all-in sustaining cash cost per pound of copper produced are shown because the Company believes they help investors and management assess the performance of its operations, including the margin generated by the operations and the Company. Cash cost and sustaining cash cost per ounce of gold produced are shown because the Company believes they help investors and management assess the performance of its Manitoba operations. Combined unit cost is shown because Hudbay believes it helps investors and management assess the Company’s cost structure and margins that are not impacted by variability in by-product commodity prices.

Article content

The following tables provide detailed reconciliations to the most comparable IFRS measures.

Article content

Adjusted Net Earnings (Loss) Reconciliation

Article content

 Three Months Ended
(in $ millions)Jun. 30, 2026
 Mar. 31, 2026 Jun. 30, 2025
Net earnings for the period138.1 191.5 114.7
Tax expense102.3 147.5 38.4
Earnings before tax240.4 339.0 153.1
Adjusting items:   
Mark-to-market adjustments 1(38.2) (38.7) 6.3
Foreign exchange loss (gain)12.0 10.7 (18.9)
Re-evaluation adjustment – environmental provision5.5 2.1 (13.8)
Manitoba cost of sales and other expense from temporary shutdown  5.3
Variable consideration adjustment – stream revenue and accretion 0.1 
Inventory adjustments0.9  3.5
Evaluation expenses9.2 2.9 
Insurance recovery(11.5)  
Reduction of obligation to renounce flow-through share expenditures, net of provisions(2.8) (3.3) (1.2)
Loss/write-down on disposal of PP&E0.5 1.0 0.3
Changes in other provisions (non-capital)  
Adjusted earnings before income taxes216.0 313.8 134.6
Tax expense(102.3) (147.5) (38.4)
Tax impact on adjusting items0.5 (4.2) (23.0)
Adjusted net earnings114.2 162.1 73.2
Adjusted net earnings attributable to non-controlling interest:
   
Net (earnings) loss for the period(0.7) (1.1) 3.0
Adjusting items, including tax impact  (0.7)
Adjusted net earnings – attributable to owners113.5 161.0 75.5
Adjusted net earnings ($/share) – attributable to owners0.28 0.40 0.19
Basic weighted average number of common shares outstanding (millions)400.4 396.9 395.1

Article content

1 Includes changes in fair value of the gold prepayment liability, Canadian junior mining investments, other financial assets and liabilities at fair value through net earnings and share-based compensation (recoveries) expenses. Also includes gains and losses on disposition of investments.                        
                
Adjusted EBITDA Reconciliation

Article content

 Three Months Ended
(in $ millions)Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Net earnings for the period138.1 191.5 114.7 
Add back:   
Tax expense102.3 147.5 38.4 
Other (income) expenses(20.7) (33.8)  
Other operating expenses4.7 10.1 7.1 
Depreciation and amortization88.8 99.9 96.4 
Amortization of deferred revenue and variable consideration adjustment(9.5) (19.5) (15.4) 
Adjusting items (pre-tax):   
Re-evaluation adjustment – environmental provision5.5 2.1 (13.8) 
Inventory adjustments0.9  3.5 
Overhead costs incurred during Manitoba temporary suspension (cash)  3.2 
Option agreement proceeds1.0 0.6 1.0 
Realized loss on non-QP hedges(0.1)  (0.4) 
Share-based compensation expenses110.2 23.5 10.5 
Adjusted EBITDA321.2 421.9 245.2 

Article content

1 Share-based compensation expenses reflected in cost of sales and selling and administrative expenses.

Article content

Net Debt Reconciliation

Article content

(in $ millions) 
 Jun. 30, 2026Mar. 31, 2026Dec. 31, 2025
Total long-term debt860.2 1,009.4 1,008.6 
Cash and cash equivalents1(890.9) (1,003.8) (568.9) 
Restricted cash related to unspent proceeds on senior unsecured municipal bonds2(49.8)   
Net debt2(80.5) 5.6 439.7 
Net debt(80.5) 5.6 439.7 
Adjusted EBITDA (12-month period)1,271.6 1,195.6 1,060.9 
Net debt to adjusted EBITDA(0.1) 0.0 0.4 

Article content

1 As at June 30, 2026 cash and cash equivalents includes $334.5 million in cash held by Copper World LLC. These funds are contractually restricted for the advancement of the Copper World project and are not available to the general Hudbay group.
2 Hudbay calculates net debt as total long-term debt less cash and cash equivalents and restricted cash related to unspent proceeds of its senior unsecured municipal bond financing. For further information on the restricted cash related to unspent proceeds of senior unsecured municipal bond financing please see note 11 in the consolidated interim financial statements.

Article content

Trailing Adjusted EBITDAThree Months Ended
(in $ millions)Jun. 30,
2026
Mar. 31,
2026
Dec. 31,
2025
Sep. 30,
2025
Jun. 30,
2025
Earnings for the period138.1 191.5 128.0 222.4 114.7 
Add back:     
Tax expense102.3 147.5 129.1 108.1 38.4 
Other (income) expenses(20.7) (33.8) (14.6) 19.6  
Other operating expenses4.7 10.1 (13.6) 9.1 7.1 
Depreciation and amortization88.8 99.9 152.5 82.7 96.4 
Amortization of deferred revenue and variable consideration adjustment(9.5) (19.5) (24.0) (6.3) (15.4) 
Adjusting items (pre-tax):     
Impairment reversal   (322.3)  
Consideration received from non-core project   (14.9)  
Re-evaluation adjustment – environmental provision5.5 2.1 (0.2) 1.4 (13.8) 
Inventory adjustments0.9  0.7 (1.3) 3.5 
Overhead costs incurred during Manitoba temporary suspension (cash)   16.0 3.2 
Overhead costs incurred during Peru temporary suspension (cash)  1.3 7.3  
Realized loss on non-QP hedges(0.1)    (0.4) 
Option agreement proceeds1.0 0.6 0.9 1.1 1.0 
Share-based compensation expenses110.2 23.5 25.8 19.7 10.5 
Adjusted EBITDA321.2 421.9 385.9 142.6 245.2 
LTM21,271.6 1,195.6 1,060.9 932.3 995.7 

Article content

1 Share-based compensation expense reflected in cost of sales and administrative expenses.
2 LTM (last twelve months) as of June 30, 2026.

Article content

Free Cash Flow Reconciliation

Article content

(in $ millions)Three Months Ended
 Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Cash generated from operations297.0211.3259.9
Adjusting items:   
Change in non-cash working capital86.92.666.0
Cash sustaining capital expenditures1108.3106.4107.2
Free cash flow101.8102.386.7
Cash sustaining capital expenditures1   
Total sustaining capital costs80.187.088.6
Capitalized lease and equipment financing cash payments – operating sites15.215.713.4
Community agreement cash payments13.03.75.2
Cash sustaining capital expenditures1108.3106.4107.2

Article content

 Three Months Ended 
(in $ millions)Jun. 30, 2026Mar. 31, 2026Dec. 31, 2025Sept. 30, 2025 LTM2
Cash generated from operations297.0211.3290.4 113.5 831.2
Adjusting items:     
Change in non-cash working capital86.92.6(127.5) 43.2 5.2
Cash sustaining capital expenditures1108.3106.4111.9 86.4 413.0
Free cash flow101.8102.3225.0 (16.1) 413.0
Cash sustaining capital expenditures1     
Total sustaining capital costs80.187.091.8 71.2 330.1
Capitalized lease and equipment financing cash payments – operating sites15.215.712.5 14.3 57.7
Community agreement cash payments13.03.77.6 0.9 25.2
Cash sustaining capital expenditures1108.3106.4111.9 86.4 413.0

Article content

1 Excludes amortization of decommissioning and restoration PP&E assets and accretion of decommissioning and restoration liabilities related to producing sites.
2 LTM (last twelve months) as at June 30, 2026.
Copper Cash Cost Reconciliation

Article content

ConsolidatedThree Months Ended
Net pounds of copper produced1   
(in thousands)Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Peru42,87145,35647,863
Manitoba5,2165,5893,554
British Columbia14,23110,62814,626
Net pounds of copper produced62,31861,57366,043

Article content

1 Contained copper in concentrate.

Article content

ConsolidatedThree Months Ended
 Jun. 30, 2026
Mar. 31, 2026
Jun. 30, 2025
Cash cost per pound of copper produced$ millions$/lb1$ millions$/lb1$ millions$/lb1
Mining117.0 1.88 93.0 1.51 85.8 1.30 
Milling94.4 1.51 91.2 1.48 92.6 1.40 
G&A52.2 0.84 61.6 1.00 43.1 0.66 
Onsite costs263.6 4.23 245.8 3.99 221.5 3.36 
Treatment & refining(0.1) (0.01) 3.1 0.05 3.3 0.05 
Freight & other21.5 0.35 22.6 0.37 20.8 0.31 
Cash cost, before by-product credits285.0 4.57 271.5 4.41 245.6 3.72 
By-product credits(309.7) (4.97) (382.1) (6.21) (247.3) (3.74) 
Cash cost, net of by-product credits(24.7) (0.40) (110.6) (1.80) (1.7) (0.02) 

Article content

ConsolidatedThree Months Ended
 Jun. 30, 2026
Mar. 31, 2026
Jun. 30, 2025
Supplementary cash cost information$ millions $/lb1$ millions$/lb1$ millions$/lb1
By-product credits2:      
Zinc9.2 0.1512.4 0.207.3 0.11
Gold3242.6 3.89297.4 4.83195.8 2.96
Silver335.4 0.5743.4 0.7123.4 0.35
Molybdenum & other22.5 0.3628.9 0.4720.8 0.32
Total by-product credits309.7 4.97382.1 6.21247.3 3.74
Reconciliation to IFRS:      
Cash cost, net of by-product credits(24.7)  (110.6)  (1.7)  
By-product credits309.7  382.1  247.3  
Treatment and refining charges0.1  (3.1)  (3.3)  
Share-based compensation expense1.2  2.9  0.9  
Inventory adjustments0.9    3.5  
Change in product inventory(17.3)  13.0  11.4  
Royalties and statutory contributions43.6  5.1  2.2  
Overhead costs incurred during Peru temporary suspension (cash)    3.2  
Depreciation and amortization588.8  99.9  96.4  
Cost of sales6362.3  389.3  359.9  

Article content

1 Per pound of copper produced.
2 By-product credits are computed as revenue per consolidated financial statements, including amortization of deferred revenue and pricing and volume adjustments.
3 Gold and silver by-product credits do not include variable consideration adjustments with respect to stream arrangements. Variable consideration adjustments are cumulative adjustments to gold and silver stream deferred revenue primarily associated with the net change in mineral reserves and resources or amendments to the mine plan that would change the total expected deliverable ounces under the precious metal streaming arrangement. For the three months ended June 30, 2026 the variable consideration adjustments amounted to $nil (three months ended June 30, 2025 – $nil and March 31, 2026 – loss of $0.1 million).
4 Certain of the Company’s properties are subject to royalty arrangements based on mineral production at the properties. Royalties include net smelter return (“NSR”) royalty and price participation agreements.
5 Depreciation is based on concentrate sold.
6 As per the consolidated financial statements.

Article content

PeruThree Months Ended
(in thousands)Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Net pounds of copper produced1 42,87145,35647,863

Article content

1 Contained copper in concentrate.

Article content

PeruThree Months Ended
 Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Cash cost per pound of copper produced$ millions$/lb$ millions$/lb$ millions$/lb
Mining42.2 0.98 34.5 0.76 28.1 0.59 
Milling50.9 1.19 43.4 0.96 57.8 1.21 
G&A25.4 0.59 33.2 0.73 23.2 0.48 
Onsite costs118.5 2.76 111.1 2.45 109.1 2.28 
Treatment & refining(0.5) (0.01) (1.6) (0.04) (0.1) 0.00 
Freight & other12.7 0.30 14.1 0.31 12.4 0.25 
Cash cost, before by-product credits130.7 3.05 123.6 2.72 121.4 2.53 
By-product credits(59.7) (1.39) (91.8) (2.02) (51.8) (1.08) 
Cash cost, net of by-product credits71.0 1.66 31.8 0.70 69.6 1.45 

Article content

PeruThree Months Ended
  Jun. 30, 2026
Mar. 31, 2026
Jun. 30, 2025
Supplementary cash cost information$ millions$/lb1$ millions$/lb1$ millions$/lb1
By-product credits2:      
Gold316.3 0.3844.90.9917.30.36
Silver321.0 0.4922.90.5013.70.29
Molybdenum22.4 0.5224.00.5320.80.43
Total by-product credits59.7 1.3991.82.0251.81.08
Reconciliation to IFRS:      
Cash cost, net of by-product credits71.0  31.8 69.6 
By-product credits59.7  91.8 51.8 
Treatment and refining charges0.5  1.6 0.1 
Inventory adjustments   1.1 
Share-based compensation expenses0.2  0.5 0.2 
Change in product inventory(20.3)  7.6 4.0 
Royalties and statutory contributions1.3  1.9 1.0 
Depreciation and amortization445.4  61.4 56.0 
Cost of sales5157.8  196.6 183.8 

Article content

1 Per pound of copper produced.
2 By-product credits are computed as revenue per consolidated financial statements, including amortization of deferred revenue and pricing and volume adjustments.
3 Gold and silver by-product credits do not include variable consideration adjustments with respect to stream arrangements.
4 Depreciation is based on concentrate sold.
5 As per the consolidated interim financial statements.

Article content

British ColumbiaThree Months Ended 
(in thousands)Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Net pounds of copper produced114,23110,62814,626

Article content

1 Contained copper in concentrate.

Article content

British ColumbiaThree Months Ended
 Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Cash cost per pound of copper produced$ millions$/lb$ millions$/lb$ millions$/lb
Mining31.3 2.20 16.2 1.53 24.2 1.65 
Milling27.2 1.91 31.5 2.96 21.4 1.46 
G&A7.9 0.56 8.4 0.79 6.1 0.42 
Onsite costs66.4 4.67 56.1 5.28 51.7 3.53 
Treatment & refining(0.6) (0.04) 2.1 0.20 2.1 0.14 
Freight & other3.5 0.24 2.8 0.26 3.3 0.24 
Cash cost, before by-product credits69.3 4.87 61.0 5.74 57.1 3.91 
By-product credits(23.5) (1.65) (35.4) (3.33) (22.2) (1.52) 
Cash cost, net of by-product credits45.8 3.22 25.6 2.41 34.9 2.39 

Article content

British ColumbiaThree Months Ended
 Jun. 30, 2026
Mar. 31, 2026
Jun. 30, 2025
Supplementary cash cost information$ millions$/lb1$ millions$/lb1$ millions$/lb1
By-product credits2:      
Gold20.7 1.4530.6 2.8819.8 1.35
Silver2.8 0.204.8 0.452.4 0.17
Total by-product credits23.5 1.6535.4 3.3322.2 1.52
Reconciliation to IFRS:      
Cash cost, net of by-product credits45.8  25.6  34.9  
By-product credits23.5  35.4  22.2  
Treatment and refining charges0.6  (2.1)  (2.1)  
Share-based compensation expenses0.6  0.6  0.2  
Change in product inventory(2.6)  11.3  3.6  
Inventory adjustments    1.4  
Royalties2.3  3.2  1.2  
Depreciation and amortization322.2  18.5  16.8  
Cost of sales492.4  92.5  78.2  

Article content

1 Per pound of copper produced.
2 By-product credits are computed as revenue per consolidated financial statements, including amortization of deferred revenue and pricing and volume adjustments.
3 Depreciation is based on concentrate sold.
4 As per consolidated interim financial statements.

Article content

Sustaining and All-in Sustaining Cash Cost Reconciliation

Article content

ConsolidatedThree Months Ended
 Jun. 30, 2026
Mar. 31, 2026
Jun. 30, 2025
All-in sustaining cash cost per pound of copper produced $ millions$/lb$ millions$/lb$ millions$/lb
Cash cost, net of by-product credits(24.7) (0.40) (110.6) (1.80) (1.7) (0.02) 
Cash sustaining capital expenditures107.9 1.73 105.2 1.71 108.3 1.64 
Royalties3.6 0.06 5.1 0.08 2.2 0.03 
Sustaining cash cost, net of by-product credits86.8 1.39 (0.3) 0.00 108.8 1.65 
Corporate selling and administrative expenses & regional costs22.0 0.35 38.1 0.62 22.1 0.33 
Accretion and amortization of decommissioning and community agreements13.6 0.06 6.5 0.11 3.2 0.05 
All-in sustaining cash cost, net of by-product credits112.4 1.80 44.3 0.73 134.1 2.03 
Reconciliation to property, plant and equipment additions:      
Property, plant and equipment additions160.0  109.5  93.6  
Capitalized stripping net additions49.8  73.0  53.8  
Total accrued capital additions209.8  182.5  147.4  
Less other non-sustaining capital costs2129.7  95.5  58.8  
Total sustaining capital costs80.1  87.0  88.6  
Capitalized lease & equipment financing cash payments – operating sites15.2  15.1  13.4  
LOM Community agreement cash payments10.1  0.6  4.1  
Accretion and amortization of decommissioning and restoration obligations32.5  2.5  2.2  
Cash sustaining capital expenditures107.9  105.2  108.3  

Article content

1 Includes accretion of decommissioning relating to non-productive sites, and accretion and amortization of community agreements capitalized to Other assets.
2 Other non-sustaining capital costs include Copper World capitalized costs, Cactus Project capitalized costs, capitalized interest, capitalized exploration, right-of-use lease asset additions, equipment financing asset additions, growth capital expenditures and reclassification related to capital spares.
3 Includes amortization of decommissioning and restoration PP&E assets and accretion of decommissioning and restoration liabilities related to producing sites.

Article content

PeruThree Months Ended
 Jun. 30, 2026
Mar. 31, 2026
Jun. 30, 2025
Sustaining cash cost per pound of copper produced$ millions$/lb$ millions$/lb$ millions$/lb
Cash cost, net of by-product credits71.01.6631.80.7069.61.45
Cash sustaining capital expenditures43.81.0230.70.6955.11.15
Royalties1.30.031.90.041.00.03
Sustaining cash cost per pound of copper produced116.12.7164.41.43125.72.63

Article content

British Columbia
Three Months Ended
 Jun. 30, 2026
Mar. 31, 2026
Jun. 30, 2025
Sustaining cash cost per pound of copper produced$ millions$/lb$ millions$/lb$ millions$/lb
Cash cost, net of by-product credits45.8 3.22 25.62.4134.92.39
Cash sustaining capital expenditures40.6 2.85 54.25.1039.62.71
Royalties2.3 0.16 3.20.301.20.08
Sustaining cash cost per pound of copper produced88.76.2383.07.8175.75.18

Article content

Article content

Gold Cash Cost and Sustaining Cash Cost Reconciliation

Article content

ManitobaThree Months Ended
(in thousands)Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Net ounces of gold produced140,34447,74343,235

Article content

1 Contained gold in concentrate and doré.

Article content

Manitoba
Three Months Ended
 Jun. 30, 2026
Mar. 31, 2026
Jun. 30, 2025
Cash cost per ounce of gold produced$millions
 $/oz$millions$/oz$millions$/oz
Mining43.5 1,078 42.3 886 33.5 775 
Milling16.3 404 16.3 341 13.4 310 
G&A18.9 469 20.0 419 13.8 319 
Onsite costs78.7 1,951 78.6 1,646 60.7 1,404 
Treatment & refining1.0 25 2.6 55 1.3 30 
Freight & other5.3 131 5.7 119 5.1 118 
Cash cost, before by-product credits85.0 2,107 86.9 1,820 67.1 1,552 
By-product credits(53.7) (1,331) (67.4) (1,412) (36.4) (842) 
Gold cash cost, net of by-product credits31.3 776 19.5 408 30.7 710 

Article content

ManitobaThree Months Ended
 Jun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Supplementary cash cost information$millions$/oz1$millions$/oz1$millions$/oz1
By-product credits2:      
Copper32.8 81334.4 72021.8 504
Zinc9.2 22812.4 2607.3 169
Silver11.6 28815.7 3297.3 169
Other0.1 24.9 103 
Total by-product credits53.7 1,33167.4 1,41236.4 842
Reconciliation to IFRS:      
Cash cost, net of by-product credits31.3  19.5  30.7  
By-product credits53.7  67.4  36.4  
Treatment and refining charges(1.0)  (2.6)  (1.3)  
Inventory adjustments0.9    1.0  
Share-based compensation expenses0.4  1.8  0.5  
Change in product inventory5.6  (5.9)  3.8  
Depreciation and amortization321.2  20.0  23.6  
Cost of sales4112.1  100.2  97.9  

Article content

1 Per ounce of gold produced.
2 By-product credits are computed as revenue per consolidated financial statements, amortization of deferred revenue, pricing and volume adjustments.
3 Depreciation is based on concentrate sold.
4 As per consolidated interim financial statements.

Article content

ManitobaThree Months Ended
 Jun. 30, 2026Mar. 31, 2026
Jun. 30, 2025
Sustaining cash cost per pound of gold produced$millions$/oz$millions$/oz$millions$/oz
Gold cash cost, net of by-product credits31.377619.540830.7710
Cash sustaining capital expenditures23.558220.342513.6315
Sustaining cash cost per pound of gold produced54.81,35839.883344.31,025

Article content

Combined Unit Cost Reconciliation

Article content

PeruThree Months Ended
(in millions except ore tonnes milled and unit cost per tonne)
Combined unit cost per tonne processedJun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Mining42.2 34.5 28.1 
Milling50.9 43.4 57.8 
G&A125.4 33.2 23.2 
Other G&A2(8.4) (16.3) (6.4) 
Unit cost110.1 94.8 102.7 
Tonnes ore milled7,828 8,164 7,559 
Combined unit cost per tonne14.06 11.61 13.59 
Reconciliation to IFRS:   
Unit cost110.1 94.8 102.7 
Freight & other12.7 14.1 12.4 
Inventory adjustments  1.1 
Other G&A8.4 16.3 6.4 
Share-based compensation expenses0.2 0.5 0.2 
Change in product inventory(20.3) 7.6 4.0 
Royalties and statutory contributions1.3 1.9 1.0 
Depreciation and amortization45.4 61.4 56.0 
Cost of sales3157.8 196.6 183.8 

Article content

1 G&A as per cash cost reconciliation above.
2 Other G&A primarily includes profit sharing costs.
3 As per consolidated interim financial statements.

Article content

British ColumbiaThree Months Ended
(in millions except tonnes ore milled and unit cost per tonne)
Combined unit cost per tonne processedJun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Mining31.3 16.224.2
Milling27.2 31.521.4
G&A17.9 8.46.1
Unit cost66.4 56.151.7
USD/CAD implicit exchange rate1.39 1.381.38
Unit cost – C$92.3 77.771.1
Tonnes ore milled3,616 3,0782,900
Combined unit cost per tonne – C$25.52 25.2324.51
Reconciliation to IFRS:   
Unit cost66.4 56.151.7
Freight & other3.5 2.83.3
Share-based compensation expenses0.6 0.60.2
Change in product inventory(2.6) 11.33.6
Inventory adjustments 1.4
Royalties2.3 3.21.2
Depreciation and amortization22.2 18.516.8
Cost of sales292.4 92.578.2

Article content

1 G&A as per cash cost reconciliation above
2 As per consolidated interim financial statements.

Article content

ManitobaThree Months Ended
(in millions except ore tonnes milled and unit cost per tonne)
Combined unit cost per tonne processedJun. 30, 2026Mar. 31, 2026Jun. 30, 2025
Mining43.5 42.3 33.5 
Milling16.3 16.3 13.4 
G&A 118.9 20.0 13.8 
Less: Other G&A related to profit sharing costs(9.6) (11.9) (7.2) 
Unit cost69.1 66.7 53.5 
USD/CAD implicit exchange rate1.38 1.37 1.38 
Unit cost – C$95.6 91.5 73.9 
Tonnes ore milled318,514 360,384 307,138 
Combined unit cost per tonne – C$300 254 241 
Reconciliation to IFRS:   
Unit cost69.1 66.7 53.5 
Freight & other5.3 5.7 5.1 
Other G&A related to profit sharing9.6 11.9 7.2 
Share-based compensation expenses0.4 1.8 0.5 
Inventory adjustments0.9  1.0 
Change in product inventory5.6 (5.9) 3.8 
Overhead costs incurred during Manitoba temporary suspension (cash)  3.2 
Depreciation and amortization21.2 20.0 23.6 
Cost of sales2112.1 100.2 97.9 

Article content

1 G&A as per cash cost reconciliation above.
2 As per consolidated interim financial statements.

Article content

Forward-Looking Information
        
This news release contains forward-looking information within the meaning of applicable Canadian and United States securities legislation. All information contained in this news release, other than statements of current and historical fact, is forward-looking information. Often, but not always, forward-looking information can be identified by the use of words such as “plans”, “expects”, “budget”, “guidance”, “scheduled”, “estimates”, “forecasts”, “strategy”, “target”, “intends”, “objective”, “goal”, “understands”, “anticipates” and “believes” (and variations of these or similar words) and statements that certain actions, events or results “may”, “could”, “would”, “should”, “might” “occur” or “be achieved” or “will be taken” (and variations of these or similar expressions). All of the forward-looking information in this news release is qualified by this cautionary note.

Article content

Forward-looking information includes, but is not limited to, statements with respect to Hudbay’s production, cost and capital and exploration expenditure guidance, Hudbay’s ability to advance and complete the multi-year optimization of the Copper Mountain mine in British Columbia, including with respect to the primary SAG mill repairs and related ramp-up plans, the implementation of stripping strategies and the expected benefits therefrom, the expected timing and benefits of British Columbia growth initiatives, including with respect to the development timelines associated with New Ingerbelle and any challenges to the New Ingerbelle permits (including LSIB’s recent application for judicial review), the estimated timelines and pre-requisites for sanctioning the Copper World project, including the completion and anticipated results of (and costs associated with) the DFS and the potential timing of a project sanctioning decision, expectations regarding the benefits of (and costs associated with) sanctioning of the Copper World project, expectations regarding the potential impact of recent policy decisions from the United States government, the benefits, timing and consummation of the definitive agreement with Wheaton Precious Metals Corp. (“Wheaton”) in respect of the enhanced precious metals stream at Copper World, the expected benefits of Manitoba growth initiatives, including the use of the exploration drift at the 1901 deposit and the potential utilization of excess capacity at the Stall mill, the ability for Hudbay to complete mill throughput enhancements at its operating business units in Peru, British Columbia and Manitoba, Hudbay’s future deleveraging strategies and Hudbay’s ability to deleverage and repay debt as needed, expectations regarding the benefits of the ASCU Transaction and the acquisition of the Cactus project, expectations regarding the timing and costs associated with the updated Cactus PFS, expectations regarding Hudbay’s cash balance and liquidity and related cash management strategies, expectations regarding Hudbay’s capital planning strategies, including but not limited to Hudbay’s enhanced Capital Allocation Framework, expectations regarding sustaining capital projects, including but not limited to the construction of a cyanide recycling initiative at the New Britannia mill and construction of a dam lift at the Anderson Tailings Impoundment Area, expectations regarding tax synergies, expectations regarding the ability to conduct exploration work and execute on exploration programs on its properties and to advance related drill plans, Hudbay’s evaluation and assessment of opportunities to reprocess tailings using various metallurgical technologies, the anticipated impact of brownfield and greenfield growth projects on Hudbay’s performance, anticipated exploration and expansion opportunities and extension of mine life in Snow Lake and Hudbay’s ability to find a new anchor deposit near Hudbay’s Snow Lake operations, anticipated future drill programs and exploration activities and any results expected therefrom, potential updates to Rockcliff’s prior mineral resource estimate for the Talbot project, the enhancement of stakeholder engagement and advancement of a pre-feasibility study and related test work at the Mason copper project in Nevada, expectations regarding the timing and costs associated with the Mason PFS, anticipated mine plans, anticipated metals prices and the anticipated sensitivity of Hudbay’s financial performance to metals prices, events that may affect Hudbay’s operations and development projects, anticipated cash flows from operations and related liquidity requirements, the ability to successfully obtain proceeds from insurance claims, the ability to achieve Hudbay’s climate change goals and initiatives, the anticipated effect of external factors on revenue, such as commodity prices, estimation of mineral reserves and resources, mine life projections, reclamation costs, economic outlook, government regulation of mining operations, and business and acquisition strategies. Forward-looking information is not, and cannot be, a guarantee of future results or events. Forward-looking information is based on, among other things, opinions, assumptions, estimates and analyses that, while considered reasonable by Hudbay at the date the forward-looking information is provided, inherently are subject to significant risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or implied by the forward-looking information.

Article content

The material factors or assumptions that Hudbay has identified and were applied in drawing conclusions or making forecasts or projections set out in the forward-looking information include, but are not limited to:

Article content

  • the ability to achieve production, cost and capital and exploration expenditure guidance;
  • no significant interruptions to Hudbay’s operations due to social or political unrest in the regions Hudbay operates, including the navigation of the complex political and social environment in Peru and the resolution of grievances raised by local communities and their residents;
  • the ability to consummate the definitive agreement with Wheaton in respect of the enhanced precious metals stream at Copper World;
  • no interruptions to Hudbay’s plans for advancing the Copper World project, including with respect to the completion of the DFS, timing of a project sanctioning decision, and any successful challenges to the Copper World permits;
  • no interruptions to Hudbay’s plans for advancing New Ingerbelle, including with respect to any challenges to the New Ingerbelle permits;
  • Hudbay’s ability to successfully advance and complete the optimization of the Copper Mountain operations, and develop and maintain good relations with key stakeholders;
  • the ability to execute on its exploration plans and to advance related drill plans;
  • the ability to advance the exploration program at the Maria Reyna and Caballito properties;
  • the success of mining, processing, exploration and development activities;
  • the scheduled maintenance and availability of Hudbay’s processing facilities;
  • the accuracy of geological, mining and metallurgical estimates;
  • anticipated metals prices and the costs of production;
  • the supply and demand for metals Hudbay produces;
  • the supply and availability of all forms of energy and fuels at reasonable prices;
  • no significant unanticipated operational or technical difficulties;
  • no significant interruptions to operations due to adverse effects from extreme weather events, including forest fires that have affected and may continue to affect the regions in which Hudbay operates;
  • the execution of Hudbay’s business and growth strategies, including the success of its strategic investments and initiatives;
  • the availability of additional financing, if needed;
  • the ability to deleverage and repay debt, as needed;
  • the ability to complete project targets on time and on budget and other events that may affect Hudbay’s ability to develop Hudbay’s projects;
  • the timing and receipt of various regulatory and governmental approvals;
  • the availability of personnel for Hudbay’s exploration, development and operational projects and ongoing employee relations;
  • maintaining good relations with the employees at Hudbay’s operations;
  • maintaining good relations with the labour unions that represent certain of Hudbay employees in Manitoba and Peru;
  • maintaining good relations with the communities in which Hudbay operates, including the neighbouring Indigenous communities and local governments;
  • no significant unanticipated challenges with stakeholders at Hudbay’s various projects;
  • no significant unanticipated events or changes relating to regulatory, environmental, health and safety matters;
  • no contests over title to Hudbay’s properties, including as a result of rights or claimed rights of Indigenous peoples or challenges to the validity of Hudbay’s unpatented mining claims;
  • the timing and possible outcome of pending litigation and no significant unanticipated litigation;
  • certain tax matters, including, but not limited to current tax laws and regulations, changes in taxation policies and the refund of certain value added taxes from the Canadian and Peruvian governments; and
  • no significant and continuing adverse changes in general economic conditions or conditions in the financial markets (including commodity prices and foreign exchange rates).

Article content

The risks, uncertainties, contingencies and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking information may include, but are not limited to, risks related to the failure to effectively advance and complete the optimization of the Copper Mountain mine operations including with respect to the primary SAG mill repairs and related ramp-up plans, political and social risks in the regions Hudbay operates, including the complex political and social environment in Peru and potential disruptions to operations arising from community protests and grievances, risks generally associated with the mining industry and the current geopolitical environment, including future commodity prices, the potential implementation or expansion of tariffs, currency and interest rate fluctuations, energy and consumable prices, supply chain constraints and general cost escalation in the current inflationary environment, uncertainties related to the development and operation of Hudbay’s projects, the risk of an indicator of impairment or impairment reversal relating to a material mineral property, risks associated with the development of new projects, risks associated with acquisitions, investments and other strategic transactions including but not limited to the recent acquisition of ASCU, risks related to the Copper World project, including the risk of capital cost escalation, risks related to ongoing litigation in respect of the project’s air permit and certain land rights, risks from community opposition, project delivery risks, joint venture risks and financing risks, risks related to the Lalor mine plan, including the ability to convert inferred mineral resource estimates to higher confidence categories, dependence on key personnel and employee and union relations, risks related to political or social instability, unrest or change, risks in respect of Indigenous and community relations, rights and title claims, operational risks and hazards, including the cost of maintaining and upgrading Hudbay’s tailings management facilities and any unanticipated environmental, industrial and geological events and developments and the inability to insure against all risks (including any unanticipated significant interruptions to operations due to adverse effects from extreme weather events), failure of plant, equipment, processes, transportation and other infrastructure to operate as anticipated, compliance with government and environmental regulations, including permitting requirements and anti-bribery legislation, depletion of Hudbay’s reserves, volatile financial markets and interest rates that may affect Hudbay’s ability to obtain additional financing on acceptable terms, the failure to obtain required approvals or clearances from government authorities on a timely basis, uncertainties related to the geology, continuity, grade and estimates of mineral reserves and resources, and the potential for variations in grade and recovery rates, uncertain costs of reclamation activities, Hudbay’s ability to comply with Hudbay’s pension and other post-retirement obligations, Hudbay’s ability to abide by the covenants in Hudbay’s debt instruments and other material contracts, tax refunds, hedging transactions, cybersecurity risks and risks related to the reliability and security of Hudbay’s information technology and operational technology systems, including risks arising from cyber-attacks, ransomware, phishing and other malware, risks associated with the use of artificial intelligence technologies, as well as the risks discussed under the heading “Risk Factors” in Hudbay’s most recent Annual Information Form which is available on the Company’s SEDAR+ profile at www.sedarplus.ca and the Company’s EDGAR profile at www.sec.gov.

Article content

Should one or more risk, uncertainty, contingency or other factor materialize or should any factor or assumption prove incorrect, actual results could vary materially from those expressed or implied in the forward-looking information. Accordingly, you should not place undue reliance on forward-looking information. Hudbay does not assume any obligation to update or revise any forward-looking information after the date of this news release or to explain any material difference between subsequent actual events and any forward-looking information, except as required by applicable law.

Article content

Note to United States Investors

Article content

This news release has been prepared in accordance with the requirements of the securities laws in effect in Canada, which may differ materially from the requirements of United States securities laws applicable to U.S. issuers.

Article content

About Hudbay

Article content

Hudbay (TSX, NYSE: HBM) is a copper-focused critical minerals mining company with three long-life operations and a world-class pipeline of copper growth projects in tier-one mining jurisdictions of Canada, Peru and the United States.

Article content

Hudbay’s operating portfolio includes the Constancia mine in Cusco (Peru), the Snow Lake operations in Manitoba (Canada) and the Copper Mountain mine in British Columbia (Canada). Copper is the primary metal produced by the Company, which is complemented by meaningful gold production and by-product zinc, silver and molybdenum. Hudbay’s growth pipeline includes the Copper World project in Arizona (United States), the Cactus project in Arizona (United States), the Mason project in Nevada (United States), the Llaguen project in La Libertad (Peru) and several expansion and exploration opportunities near its existing operations.

Article content

The value Hudbay creates and the impact it has is embodied in its purpose statement: “We care about our people, our communities and our planet. Hudbay provides the metals the world needs. We work sustainably, transform lives and create better futures for communities.” Hudbay’s mission is to create sustainable value and strong returns by leveraging its core strengths in community relations, focused exploration, mine development and efficient operations.

Article content

For further information, please contact:
Candace Brûlé
Senior Vice President, Capital Markets & Corporate Affairs
(416) 362-8181
[email protected] 

Article content

____________________
i Adjusted net earnings – attributable to owners and adjusted net earnings per share – attributable to owners, adjusted EBITDA, cash cost, sustaining cash cost, all-in sustaining cash cost per pound of copper produced, net of by-product credits, cash cost, sustaining cash cost per ounce of gold produced, net of by-product credits, combined unit cost, net debt, net debt to adjusted EBITDA ratio and free cash flow are non-GAAP financial performance measures with no standardized definition under IFRS. For further information and a detailed reconciliation, please see the discussion under the “Non-GAAP Financial Performance Measures” section of this news release.
ii Liquidity includes $890.9 million in cash and cash equivalents as well as undrawn availability of $153.7 million under Hudbay’s revolving credit facilities.

Article content

Article content

Article content

Article content

Article content

Article content

Read Entire Article

         

        

Start the new Vibrations with a Medbed Franchise today!  

Protect your whole family with Quantum Orgo-Life® devices

  Advertising by Adpathway